Index
103
Index
ibc = inside back cover
advance signs 16–17, 25, 47, 91
amber beacons 15, 25
barriers:
pedestrian 14, 27, 30–1, 33, 50, 97–8
traffic 20, 22, 37, 94
bus lanes 52
chicanes 67, 68
cones:
size 93, ibc
specification 21, ibc
taper 17, 19, 22, 23, 27, 37, 43, 91
convoy system 55, 68–9,
cycles
general 33–4, 50, 70,
routes 13, 15, 20, 25, 33–4, 70–1
dual carriageway 18, 23, 40–1, 69, 91
emergencies 10, 14, 15, 23, 34, 52, 63,
67, 70, 71, 73, 76, 78
end sign 24
excavations 20, 29, 30, 31, 32, 82, 98–100
exit taper 19, 22, 23, 24, 37
footway
boards 29, 30, 99
delays 32
ramp 29, 30, 98
temporary 28, 30–1, 32
give and take 54, 56, 70
guide island 40, 42
high visibility clothing 11, 25, 72, 93
information board 23, 27,
junctions
general 13, 22, 43, 62, 63, 64, 66, 68
with traffic lights 43, 47, 56
keep right/left sign 17
lamps 19, 20, 94, 97
lane width 52, 57
lead-in taper 17, 19, 22, 24, 26, 27, 38
lighting 12, 14, 15, 18, 19, 25, 81, 83, 86,
90, 91
longways clearance 22, 38
maintenance of site 9, 11, 12, 81–2, 93
mobile works 20, 23, 83, 86, 90, 91,
100 –101
parking 14, 15, 37, 57, 63, 66
pedestrian:
crossings 14, 29, 31, 33, 43, 56, 63, 66,
82, 83
routes 28–30
pedestrianised areas 33
plates used with signs 17, 41, 43, 54, 90, 94
portable traffic signals 10, 11, 31, 33, 34,
43, 54, 55, 56, 62–7, 68, 79, 82, 83
priority signs 58–9
railway level crossing 13, 54, 56, 62, 63,
66, 77–9
ramps 29, 30, 98, 100
reflectorisation 93
risk assessment 9, 10, 12, 55, 68, 70, 71,
86, 91, 93, 98
road narrows sign 17, 47, 92
road plates 99–100
road widths 11, 13, 18, 34, 40
road works ahead sign 17, 24, 25, 26, 28,
43, 92
roundabouts 47–50, 63, 66
safety zone 16, 19, 20, 22, 27, 30, 37, 38,
62, 68, 70, 76
short duration works 20, 23, 24, 83, 86–92
shuttle lane working 33, 62, 64, 66
sideways clearance 20, 22, 23, 30,
67, 76
signs:
basic 16, 17, 24, 26–7, 95
duplicates 18
lighting 94
permanent 13, 16
securing 18
setting out 18, 25, 25–7, 93
site clearance 83
speed control 67
speed limit, temporary 24, 38, 67, 76
stop-works sign 55, 72
stop/go boards 11, 54, 60–3
street lighting 14, 19, 97
tapping rail 95, 97
traffic control 13, 17, 18, 34, 40, 43,
52–64, 66, 67–8, 70–4, 83
traffic conditions, changing 94
traffic signals:
permanent 13, 16, 43
portable 29, 31, 33, 34, 43, 54, 55, 56,
62–4, 66, 67, 68, 79, 82, 83
tramways
general 9, 13, 63, 74–7, 79
overhead cables 13, 77
unattended works 31, 81–3, 98
variable message signs 24–5
weather 14, 81, 82, 94
work site access 31, 41, 42
working space 11, 19, 20, 27, 30, 31, 33,
37, 68, 93, 97
works area 20, 21, 22, 37, 38, 99
works vehicle 16, 22, 23, 24, 37–8, 68, 72
8815 Safety at Streetworks v1_12.indd 103 27/05/2014 10:38