Contractor: Very Best Construction Company Prepared May 1, 2003 / Revised July 3, 2003
Project: Renovation/Addition to Big Building, Queens, N.Y.
Designated Recycling Coordinator: Joe Doe
Waste Management Goals
· This project will recycle, reuse or salvage at least 75%, by weight, of the waste generated on site.
Waste Prevention Measures
· Five large rooms on the 1
st
Floor, near the service elevator, have been designated for storage of delivered
material and equipment until it is needed. These rooms are dry and lockable. Each Prime Contractor has been
assigned one of these rooms.
· Reusable metal forms will be used for the concrete structural elements.
· Each major vendor will be sent a letter requesting their cooperation in planning for minimal or take-back
packaging, and just-in-time delivery. The Recycling Coordinator will provide a draft letter to each Prime
Contractor for their use.
· A mock-up of the ceiling, soffit, ductwork and lighting shown on detail xyz will be built for coordination and
review before proceeding with this work.
Reuse and Salvage Items (Included on the chart below)
· The paneled doors from the existing offices will be reused per the documents.
· Excavation rock will be crushed and used as fill on site.
· Shelving removed from the library will be donated to Dick and Jane School
Communication Plan
· Waste prevention and recycling activities will be discussed at each job meeting.
· The recycling coordinator will give each contractor and subcontractor a copy of the Waste Management Plan,
provide instruction in appropriate separation and handling procedures and show them the recycling areas.
· Prime contractors will be expected to make sure that their workers comply with the Waste Management Plan.
· All recycling containers will be labeled in English and Spanish, with acceptable / unacceptable materials posted.
Each sign will have a representative picture of the materials to be recycled.
· If methods or container locations change during the course of the project, the Recycling Coordinator will notify
each contractor and subcontractor in writing.
Contamination Prevention Measures
· Small roll-off containers convenient to work areas will be used; Very Best Contracting will periodically
consolidate the contents in the appropriate dumpsters. Garbage containers for non-recyclable materials will be
located adjacent to recycling containers.
Sample Waste Management Plan
1
DDC SAMPLE C&D WASTE MANAGEMENT PLAN
June 2003
· If any containers are near the driveway, they will be securely covered when not supervised.
· An eating area has been designated on site, and workers will not be permitted to eat elsewhere in the building.
Documentation to be Provided
· Recycling Reports; Weight tickets and receipts from companies listed below.
· Letter from Waste Corp., certifying the overall percentage of mixed C&D waste that they recycle.
EXPECTED PROJECT WASTE, DISPOSAL/RECYCLING/REUSE AND HANDLING
Demolition Phase
Percentage of material to be Recycled, Salvaged or Reused
Material Quantity
%
Recycle/Salvage/Processing
Company
On-Site Handling Procedure
Concrete
Recycle: XYZ Company Deposit in concrete bin. Rebar OK
Ceiling tile
Recycle: Armstrong
Industries
Collect on pallets, each floor
Steel/Metals
Recycle: NY Metals Deposit in metals container
Paneled Wood Doors
Reuse per documents
Collect in room A; Protect until
reused
Library Shelving
Salvage: Donate to Dick and
Jane School
Remove in sections and store in room
B for School pick-up
Mixed C&D waste
8 tons recycled
12 tons landfill
40%
Sort/Disposal: Waste Corp. Deposit in general dumpster
Garbage/Other waste
0
Landfill Deposit in container X
Construction Phase
Material Quantity
%
Recycle/Salvage/Processing
Company On-Site Handling Procedure
Excavated Rock
Reuse on site as fill Collect for crushing by Inert Inc.
Cardboard packaging
Recycle: Tri-State Paper Collect on each floor for bundling
Steel/Metals
Recycle: NY Metals Deposit in metals container
Mixed C&D waste
4 tons recycled
6 tons landfill
40%
Sort/Disposal: Waste Corp. Deposit in general dumpster
Garbage/Other waste
0
Landfill Deposit in container X
Summary – Expected C & D Waste and Diversion Rate
Total C & D Waste x Tons Total waste expected to be generated in demo and construction
Total Recycled + y Tons Materials to be diverted from landfills, by salvage, reuse and recycling
Diversion Rate y/x % Percentage of project’s waste expected to be diverted from landfills
This Plan has been prepared with the knowledge and cooperation of the demolition subcontractor, DDD Demo, and the
other Prime Contractors on the project: EEE Electrical Contracting; MMM Mechanical; and PPP Plumbing Ltd.
Signed: _________________, Very Best Construction Company July 1, 2003