PROJECT MANAGEMENT PLA
N
IRM-5231-19
A
c
. A review is an evaluation of software products regardin
g
form and technical content
. It is conducted by projec
t
management for the purpose of detecting and correctin
g
deficiencies
. This paragraph shall list all such planne
d
reviews
.
3
.1
.3
Configuration Management Audits, Reviews, and Baseline
s
This paragraph shall provide a list of the audits and reviews t
o
be performed by project configuration management (CM
)
personnel
. This paragraph will also include a list of C
M
baselines that will be established during the life of the AI
S
project as a result of CM reviews
. Depending on the size an
d
complexity of the project, a separate CM Plan may be required
.
See IRM-5231-09 (CM Plan) for details regarding CM
.
a
. The following CM audits will normally be listed
.
(1)
Functional Configuration Audit (FCA) - a forma
l
audit to validate that the development of the configuration ite
m
being audited has been completed satisfactorily, has achieve
d
specified performance and functional characteristics, an
d
complies with operation and support documentation
.
(2)
Physical Configuration Audit (PCA) - a technica
l
examination
of a designated configuration item to determine it
s
conformance to the technical documentation definition
.
b
. The following CM reviews will normally be listed
.
(1)
Systems Requirements Review (SRR) - a review o
f
the system requirements specifications and preliminary suppor
t
plans to determine if the functional requirements are complete
,
feasible, verifiable, and testable
. Successful completion o
f
this review results in the establishment of the
Functiona
l
Baseline
.
(2)
Preliminary Design Review (PDR) - a revie
w
conducted upon completion of the general design to evaluate th
e
progress, technical adequacy, quality, and testability of th
e
selected design approach
.
(3)
Critical Design Review (CDR) - a review performe
d
at the conclusion of the design phase to determine th
e
acceptability of the detailed design, the performance and tes
t
characteristics of the design solution, and the adequacy of th
e
operation and support documentation
. Successful completion o
f
this review results in the establishment of the Allocate
d
Baseline
.